1. Oversizing for export
A system far bigger than your own usage leans on export credit to justify itself. Rules and rates can change, and surplus you never use is money sleeping on your roof. Size for your own load first.
2. No battery plan
Even if you skip batteries today, your inverter, board and wiring should be ready for them. Homes that ignore this face a costly rebuild the first summer load shedding returns.
3. Weak structure
Panels live on that structure for decades, through wind and storm seasons. Thin, rust prone framing is a saving that costs you the whole system one bad night.
4. Ignoring shade and direction, and 5. No after sales
A shaded or badly angled array under generates every single day, so a proper survey checks shade and direction before a single hole is drilled. And solar is a 25 year relationship, not a one day fitting: if your installer will not answer the phone next year, the cheapest quote was not cheap. Choose a local team you can walk in and meet.